<< Content  

Construction

Introduction into use of important industrial enterprises (capacities) and objects
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1990
Tin plant mln conditional jar Ali-Bayramli 4
Bakery products plant ton in a day Agdam 650
Brick plant mln units   29
of which:   Agdash 5
    Imishly 10
    Ismayilly 6
    Masally 8
Place for storage meat ton in a day Ujar 5
Clothing factory sewing equipment, unit Khogali 80
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1991
       
Plant of skimmed milk thsd. m2 Sharur 10
Bakery unit in shift, ton Shahbuz 24
Carpet workshop thsd. m2 Agdara 140
Clothing products mln. rubl Khojavend 1,0
Azerit manufacturing plant thsd. m3 Sumgait 150
Leather mln rubl Agdara 1,0
  dekarativ blok,    
Guzdak quarry thsd. m2 Absheron 16
Bakery enterprise in shift, ton Balaken 9
Connfectionary workship in shift, ton Geychay 2
Reinforced-concrete      
products plant thsd. m3 Zagatala 1,2
Asphalt coucrete plant thsd, ton Zaqatala 2
Mieat plant (expansion) in shift, ton Lankaran 6
Plant of construction      
Brick plant mln. unit Agstafa 1,0
Brick plant mln. unit Tovuz 1,5
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1992
       
Elekrtic lines with      
6-10 km tensron km   120,1
Electric transmitter with power more them 35 kWt km   67,4
Assembly reinforsed concrete and parts thsd m3 Khachmaz 5,0
Big house construction plants and other counstructions   Baku 300
Brick plant mil. unit Gusar 5,0
Brick plant mil. unit Sumgait 5,0
Tin plant mln conditional jar Shaki 7,0
Tin plant mln conditional jar Guba 3,0
Bread-roll backing      
enterprise-total in shift, ton   7,0
of which:   Zagatala 2,0
    Qakh 2,0
Powergranade juice   Ujar 3,0
manufacturing dekalitr Gusar 29,0
Motor ways with      
hard surface km   99,9
Irrigated lands thsd ha   4,9
Refrigerator capacity t.   150
Motor ways km   24,4
Radio-rele line km   61,5
Automat telephone      
stations thsd. number   13,3
Water pipe km   25,9
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1993
       
Plant of printing boards thsd. m2 Baku 80
Reinforced-conerete      
products plant thsd. m3   6,0
of which:   Zagatala 2,0
    Tovuz 2,0
    Gabala 2,0
Brick plant mln. unit Gabala 1,5
Bread-roll backing      
enterprise ton in a day Agjabadi 5
Milk plant in shift, ton Devechi 10
Milk plant in shift, ton Beylagan 10
Tin plant mln conditional jar Beylagan 5
Bread-roll backing      
enterprise in shift, ton Ismayilly 8
Water refining      
equipment thsd. m3 Kurdamir 3,7
Bread-roll backing      
enterprise in shift, ton Lankaran 15
Egg orrented poultry farm thsd. hen Bilasuvar 12
Meat orented poultry farm thsd. poultry Bilasuvar 140
Bread-roll backing enterprise in shift, ton Sabirabad 6
Bread-roll backing enterprise in shift, ton Khachmaz 4
Egg orrented poultry farm thsd. hen Neftchala 25,2
Egg orrented poultry farm thsd. hen Absheron 27
Meat orented poultry farm thsd. poultry Absheron 672
New oil processing plant katalitik kreking thsd. ton in a year Baku 2000
"Sintez kauchuk" manufacturing Unnon, ethlyen thsd. ton in a year Sumgait 260
"Sintez kauchuk" manufacturing Unnon, propilen thsd. ton in a year Sumgait 136
Cable-rele line km   206,1
Radio-rele line km   60,0
Automat telephones station thsd. number   33,5
Motor ways with hard surface km   95,2
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1994
       
Tin plant mln conditional jar Lerik 4
Bricle plant mln. unit Shamkir 3,0
Glass plant mln. unit Ganja 37
Meat factory in shift, ton Zagatala 2,0
Meat factory, sausage manufacturing in shift, ton Zagatala 2,0
Spinning factory thsd, ton Ganja 4,3
Cotton filament factory thsd, ton Goychay 4,7
Bridge over the Kur river running meter Salyan 333
Bridge over the Tartar river running meter Barda 128
Bridge over the Khachin river running meter Barda 56
Automat telephone station thsd. numbers   7,7
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1995
       
Stocking factory mln pair a year Baku 5,0
Plant of grain products in shift, ton Devechi 500
Mixed fodder plant in shift, ton Khachmaz 180
Runway at Baku airport thsd. m2 Bine avenue, Baku 144,0
Bread and badcery workshop ton, in the day Mardakan 36,0
Bus sation passenger Ali Bayramli 300,0
Automat telephone station thsd. number   8,0
Brige running meter   238,5
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1996
       
"Coca-cola" plant thsd. litr in a hour Baku 24
Manufacrure of ice-cream ton in a year Baku 125,0
    Gazakh and  
Bread and badcery workshop in shift, toun Absheron regions 7,5
Set up of Dubend-Baku oil pipeline km Baku 31,1
Radio-television installation station unit Naftalan 1
Radio-television transmission power unit/kWt Baku 16
Automat telephone station thsd. number Baku, Ganja, Sumgait and oth. 18,2
Cable communication line km Zardab-Agjabedi 38,5
Bridge running meter Sheki 114,4
Administrative building of the International Bank unit Baku 1 object
Nut manufacturing plant thsd. toun, in the year Baku 5,0
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1997
       
Bread and badcery workshop in shift, toun Baku, Absheron region 1,5
Electric transmitter with power more them 35 kWt km Baku 7,94
Electric transmitter with power more them 35 kWt thsd.kW.A Baku 86,3
Cable line high tension km Baku 1,68
Water pipeline thsd. m3 m/km in hour Baku 1,25/34,9
Automat telephone station thsd. number Baku, Sumgait and other regions 9,4
Cable communication line km Zardab-Agjabedi 39,5
Bridges running meter Nakhchivan AR 85,0
Motor ways with hard surface km   4,5
Works on reinforcment of banks of rivers running meter Sheki, Zagatala, Gakh 1851
Sangachal terminal reservoir to receive, store and preparation of oil unit/thsd. m3 Baku 4/100,8
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1998
       
Set up of air electric trans-mission line of 10 kWt tension km Jeyranbatan water pipeline 4,1
Automat telephone station thsd. number   107,8
of which:   Baku 56,1
    Nakhchivan AR 23,2
    Ganja 7,7
    Absheron 7,2
    Guba 5,1
    other regions of Republic 8,5
Cable communication line km Oghuz-Sheki directions 43,2
Oil products pipeline running meter Baku, Biryuk Shor 6300
Motor ways km Nakhchivan AR 18,0
Bridges running meter Nakhchivan AR 140,0
Half stations with tension less than 35 kWt MWt Baku 45
"İSR Plaza" business center thsd. m2 Baku 20,0
Administrative building of the National Bank   Baku 1 object
Administrative building of the Joint Stocle Savings Bank   Baku 1 object
Musical Comedy Theatre's building   Baku 1 object
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
1999
       
Generator MWt Mingechevir 106
Electric transmitter with power more them 35 kwt km Goranboy, Barda, Nakhchivan AR 104,48
Electric transmitter with power more them 35 kwt thsd. kWA Baku 40
Avtomat telefon stansiyaları - total thsd. number   41,6
of which:   Baku 11,1
    Nakhchivan AR 10,8
    Ganja 11,1
    Khanlar 3,1
    other regions of Republic 5,5
Cable communication line - total km   91,6
of which:   Baku  
    Sheki 6,3
    Hajigabul 52,0
International Air Station Complex in Bina Airport in one hour passenger   1600
Wheel way for a plane km Baku 2,5
Manufacture of milk and milk products in shift, ton Baku 5,0
Reconsrtuction of Khirdalan beer plant thsd. D/L in the year Baku 1500,0
Manufacture of "Pepsi-Cola" litre, in one hour Baku 6000,0
Motor ways km Nakhchivan AR 35
Bridges running meter Nakhchivan AR 160
Trading centre thsd.m2 Baku 8,1
Trading education centre thsd.m2 Nakhchivan AR 4,8
Reinforcement of works running meter Zagatala, Gakh 600
"PARK HYATT" Hotel thsd.m2, place Baku 11,2/179
Education Corpus of the Nakhchivan State University place Nakhchivan AR 1600
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2000
       
Yenikend Water electric station, turbines MWt Shamkir 112,5
Electric transmitter with power more them 35 kwt km Yenikend-Ganja 59,2
"New gaz turbine installation in the Baku heat plant, - MVT -Stbam manufacture ton, in one hour Baku 53,5200
Electric line with power more them 10 kWt km Absheron 10
"Azernefryag" plant, manufacture of bitum thsd. ton in a year Baku 250
"Gurtulush" drilling installation unit Baku 1
Vodka manufacturing plant in a day d/l Baku 1500
The second patr of the Head Mil-Mugan collector km Sabirabad-Saatly 52,9
Drenage network-total ha   120
of which:   Barda 20
    Shamkir 50
    Terter 50
Improvement of water supply ha Sheki 2000
Reinforcement of banks -total running meter   557
of which:   Oghuz 250
    Zagatala 170
    Gakh 137
Automat telephone stations -total thsd. number   86,1
of which:   Baku 32,8
    Sumgait 6,4
    Mingechevir 17,9
    Yevlakh 7,2
    Lankaran 5,0
    Masally 2,6
    other regions of Republic 14,2
Cable communication line-total km   53,2
of which:   Absheron 30,6
    Khanlar 19,0
    Shamakhy  
Motor ways repaired km Nakhchivan AR 69,5
Bridges, repaired running meter Nakhchivan AR 109
Bridges, newly constructed running meter Nakhchivan AR 200
Medical education corpus of Nakhchivan State University place of/bed Nakhchivan AR 600/40
Reconstruction of the Centeral Clynic hospital unit Baku 1 object
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2001
       
Vapor Generator complex in department of ethylenepolyethylene plant vapor production in an hour, ton Sumgait 480
Exploration well in Guneshli oil field unit Baku 8
Construction of oil pipeline in plant from tank of Boyuk-Shor oil base for manufacture km Baku 25,5
New workshop in Baku European Tobacco ATSC billion unit in a year Baku 2,6
Refrigerator once keeping, tonBaku 500
Baku Steel Company plant liltings production, thsd. ton Baku 70
Construction of Imishly-Parsabad Electricty transmit line km Imishly 32,5
Transformer semistation wüith high voltage 220/110/10 Kv mva Sumqait 200
Reconstruction of semistation MWT Sumqait 400
Improvement of water supply of Jeyranchol field thsd. ha Agstafa 210
Collector-drainage network ha Barda Terter 6060
Cable communcation line-total thsd.km   1,1
Dial exchange-total thsd. number   103,9
of which:   Baku 40,7
    Sumgait 5,0
    Ganja 3,0
    Mingechevir 2,0
    Sheki 15,6
    Barda 8,6
    Zagatala 5,8
    Gusar 3,2
    Absheron 2,9
    Lankaran 2,4
    Balaken 2,2
    in other regions of Republic 12,5
New motor roads km Nakhivan AR 31,5
New bridges, constructed running meter Nakhivan AR 70
Administrative Buiding of National Olympic Committee unit Baku object
Gymnasium with 1000 seats in Olympic Complex unit Baku 2 gumaniums
       
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2002
       
Electricity cable with 35 kWt.      
power and over km in regions of the country 36,7
       
Installed electricity cable km in regions of the country 23,0
       
Bitumen production equipment      
in Ethylene-polyethylene plant ton in year Sumgait 600
       
Railway station reception in shift Mingechevir 50
       
Automatic telephone station thsd. number in regions of the country 66,9
       
Fibel-optical cable main line km Khaldan-Mingechevir-  
    Sheky-Gakh 153,6
       
Dam thsd. running meter in regions of the country 2,1
       
Gas pipeline km in regions of the country 94,1
       
Motor road km   68,2
including:   Nakhchivan AR 49,5
    Siyazan 8,7
    in regions of the country 10,0
       
Bridge running meter Nakhchivan AR 67
       
Administration building of      
Embassy of Azerbaijan Republic      
in Turkey   Ankara object
       
Olympic Sport Complex   Nakhchivan c. object
    Ganja c. object
    Sheky c. object
       
Recreational area "Jannat baghi"   Guba object
       
Restaurant "Mark Drive"   Baku object
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2003
Tube-concrete plant, covering of tubes against corrosion per year, km Baku 528,0
Electric power station with steamgas turbine in North SRES MWt Baku 400,0
Turbin in Yenikand hydro-electric power station MWA Shamkir 37,5
Generator in Mingechevir hydroelectric power station MWt Mingechevir 70,4
Heating-Electric Center-1   Baku  
-heating-electric installation with gas turbine thsd. KWt   53,5
-steam generator installation steam generation per hour, ton   200,0
Transformer substation with 35 KWT and more power MWA   340
of which:   Fizuli 25,0
    Aqjabedi 280,0
    Imishly 35,0
Enterprises on production of detergent powder thousand ton per year Baku 12,0
Plant producing bakery products tonne, per shift Nakhchivan AR 30,0
Mill flour production per day, ton   24,0
of which:   Sharur 12,0
    Julfa 12,0
Undergrround named after H.Aslanov   Baku objekt
Automat telephone station km in regions of the country 222,6
DAM thousand running meter in regions of the country 12,1
Motor roads km in regions of the country 91,0
Bridges runninq meter   85,5
of which:   Nakhchivan AR 38,0
    Goychay 47,5
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2004
Sturgeon rearing station mln. fish per year Neftchala 15,0
Electric power line 10 kw km Absheron 10,21
  km Fuzuly 9,44
Installation of electric power line of 110/35 kwt km Imishli - Beylagan 47,00
Substation of 110 kwt MVA Julfa 50,0
Substation of 10-35 kwt KVA Sederek 250
KVA Kengerly 6300
Substation of 35 kwt and higher MVA ?mishly 250,0
Construction of subtransformer of 110/35 kwt and higher MVA Fuzuly 16,0
Gas pipe km other regions of the country 248,6
Production of bread and bakery products ton per day Nakhchivan AR 30,0
Flour production ton per year Sheky 110,0
Mill flour production, ton per day Sederek 15,0
Production of tomato paste ton per year Lenkeran 1200,0
Tinned food factory "Caucasus" mln. conventional tin per year Khachmaz 50,0
Beer production thousand decalitre per year Lenkeran 12,5
    Mingechevir city 216,0
Production of sugar ton per shift Masally 7,0
Brick production factory thousand brick per day Siyezen 15,0
"Azbentonit" plant, production of bentonit ton per day Absheron 60,0
Production of television mln unit per year Shamakhy 1,2
Nakhchivan International Airport passenger per hour Nakhch?van city 300
Briges running meter Nakhchivan AR 53,0
Automat telephone station thousand numbers   121,6
of which:   Baku city 78,8
    Mingechevir city 1,0
    Ali Bayramly city 2,0
    Sumgait city 3,7
    Tovuz 4,5
    Agstafa 3,2
    Gebele 2,7
    Masally 1,0
    other regions of the country 24,7
Reinforcement of works running meter   2483,0
of which:   Gusar 1022,0
    Gazakh 190,0
    Sheky 180,0
    Agsu 170,0
    Gakh 165,0
    Zagatala 321,0
    other regions of the country 435,0
Training school of Baku Corporate      
University sq.m Baku city 4000
Library reader seat Nakhchivan city 260
Swimming pool   Nakhchivan city object
    Berde city object
Rehabilitation centre   Nakhchivan city object
    Ali Bayramly city object
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2005
Freight terminal in Bina International Airport named after H.Aliyev sq.m Baku city 12784
TV plant mln. unit per year Shamakhy 1,2
Water reservoir in Vaykhir mln. m3 Babek 100,0
Electric transmitter with power more them 10-35 kw KVA Sederek 3136,0
Transformer substation with 35 KWT and more power MVA Sharur 80,0
Mill production of flour, ton per day Ordubad 15,0
Dairy products production unit ton per shift Nakhchivan city 29,0
Nut manufacturing unit ton per year Gakh 200,0
Tomato canning factory ton per day Astara 300,0
Fruit juice plant conventional tin per year Shaky 7,3
Main qas pipline km Julfa-Nakhchivan city 41,6
Coastal reinforcement DAM running meter Sheky-Zaqatala 1177,0
    Sharur 1600,0
Motor road, reconstruction km Alat-Gazimammad 45,6
    Ganja-Gazakh 21,0
Concrete-mixing plant m3 per year Babek 500,0
Automatic exchange, total thousand numbers   164,2
of which:      
    Baku city 70,8
    Sumgait city 5,0
    Ganja city 2,9
    Ali Bayramly city 8,0
    Goranboy 14,9
    Absheron 11,4
    Lenkeran 8,3
    Yevlakh 4,3
    Masally 3,0
    Gazakh 2,8
    Shamkir 2,4
    Barda 2,2
    Gabala 2,1
    Goychay 1,3
    Tovuz 1,0
    other regions of the country 23,8
Olimpic Sport Complex   Shamakhy city object
Rehabilitation Center bed   34
    Sumgait city 20
    Sheki city 14
Boarding house for War invalids seat Baku city, Shaghan settlement 250
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2006
Baku-Tbilisi-Jeyhan oil pipe-line*) km Baku 442
Baku-Tbilisi-Erzurum gas pipe-line*) km Baku 442
Motor-car factory unit per year Shamakhy 2160
Sugar plant processing sugar bect thsd. ton per shift Imishli 6
Factory producing fruit juice mln. conditional jar Sheky 1.7
International Airport passenger per hour Ganja city 300
Vaykhir Hydro-Electric Power Station MVt Nakhchivan AR 4.5
Generator MVt Mingechevir city 30
Module type of electric power station MVt   348
including:      
    Nakhchivan city 87
    Astara 87
    Sheky 87
    Khachmaz 87
Clothes factory thsd. unit per year Lenkeran 60
Chocolate factory ton per month Ganja city 30
Workshop processing dried freeits ton per day Nakhchivan city 5
Workshop producing halva ton per day Nakhchivan city 3
Workshop processing and packing tea ton per month Nakhchivan city 80-100
Workshop producing furniture thsd. manat per year Nakhchivan city 600
Workshop producing vodka thsd. bottle per hour Babek 3
Workshop producing bread ton per day Baku 7.5
Computer production enterprise computer, unit per day Mingechevir city 140
New gas pipe-line km   405.3
including:      
    Nakhchivan AR 326.3
    other regions of the country 79
Motor road km Bilasuvar 19
Bridges   Baku 2 bridges
Automatic telephone exchange thsd. number   280.6
including:   Baku 179.1
    Aqjabedi 13.1
    Masally 10.1
    Samukh 6.5
    Khachmaz 6.4
    Astara 5.3
    Zaqatala 4.9
    Lenkeran 4.9
    Hajigabul 4.6
    Sabirabad 4.5
    Gabala 4.5
    Tovuz 3.5
    Guba 3.2
    Shamkir 3.1
    Ismailli 2.4
    Barda 1.9
    Beylagan 1.9
    Neftchala 1.8
    Oguz 1.4
    Jalilabad 1.3
    other regions of the country 16.2
Stadium thsd. plase Lenkeran 15
including:   Sheky 120
Swimming pool   Ganja city object
Diagnostic Treatment Center   Nakhchivan city object
Sanatorium   Kurdamir object
Name of the enterprises and production powersUnit of measurementPlace of introduction into usePower introduction into use
2007
Model type of new electric line over 104 MVt MVt Baku 104,4
Half stations with tension less than 110/35-6/10 KWt MVA other regions of the country 530,0
Setup of trans-mission line of 0.4-10 KWt tension km other regions of the country 260,05
Lining of electric lines of 35/300 and more km other regions of the country 47,3
Reestablishment of electroliz corps №1 and 2 of Azeraliminium open stock joint company production of aliminium, thsd. ton per year Sumgait city 30,0
Non-ferrous metals production factory ton per hour Nakhchivan city 1,5
Brick production factory mln. unit Sheky 3,5
Bentonit plant production of clay, ton per day Gazakh 350,0
Asphalt-concrete factory ton per hour Nakhchivan city 60,0
Tin plant mln. conditional tin per year Gabala 8,8
Butter refinery plant thsd. ton per year Shirvan city 14,0
Dairy products production plant ton per year Salyan 30,0
Beer production plant mln. litre per year Nakhchivan city 3,0
Factory of bakery products ton per day Sharur 5,0
Workshop producing bread ton per day İmishli 5,5
Workshop on pomegranate juice thsd. conditional bottle per year Goychay 200,0
Workshop Filling of mineral waters thsd. bottle per hour Julfa 3,0
Meat orented poultry farm 45 day/ton   80,0
    Babek 50,0
    Ordubad 30,0
Wheat terminal keeping, thsd. ton per year Baku 500,0
Glass-fibre pipe production thsd. ton per year Sumgait city 29,0
Marble workshop during a day, sq. m Nakhchivan city 350,0
Reinforcement of banks thsd. running meter other regions of the country 7,4
Market-trade centre thsd. sq. m Gabala 12,0
Motor ways km Hacigabul-Kurdamir 75,0
Bridge   Baku 3 bridge
  running meter Nakhchıvan AR 52,0
Automat telephone station thsd. number other regions of the country 132,5
Fiber-optimal cabel line km other regions of the country 447,7
Diagnostic Treatment Centre   Shirvan city object
Olimpic Sport Complex   Masally object
    Gazakh object
*) Azerbaijan part

<

© The State Statistical Committee of the Republic of Azerbaijan